is it possible to connect both of them so when they register on one it'll go for both so they don't need to register twice one for copper and one for ib
any ideas :?:
that's the idea of "integration" that is available with cpg 1.1.1 and later. Read the docs how to do this. Integration with invision board is reported to be tricky, do a search on the board for this.
GauGau